Download Print this page
Zoeller CRAWL SPACE 108 Instructions Manual
Zoeller CRAWL SPACE 108 Instructions Manual

Zoeller CRAWL SPACE 108 Instructions Manual

Pumping system

Advertisement

Quick Links

Notice to iNstaller: instructions must remain with installation.
Your Peace of Mind is Our Top Priority
Product information presented
here reflects conditions at time
of publication. Consult factory
regarding discrepancies or
inconsistencies.
Zoeller Pump Company is one of the oldest and largest pump manufacturers in the U.S. and has a history of supplying innovative
products and services to its customers.
Through research and development, design, testing and manufacturing, we have been able to bring products to the market that solve
problems that plague consumers, industry, and the environment. This commitment to our customers has enabled them to enjoy returns
of our joint efforts.
1. Inspect your unit. Occasionally, products are damaged during shipment. If the unit is damaged, contact your dealer before using.
DO NOT remove the test plugs in the cover nor the motor housing.
2. Carefully read the literature provided to familiarize yourself with specific details regarding installation and use. These materials should
be retained for future reference.
SEE BELOW FOR LIST OF WARNINGS
1. To reduce the risk of electrical shock, a properly grounded
receptacle of grounding type must be installed and protected
by a ground fault circuit interrupter (GFCI) and in accordance
with national electrical code and local codes.
2. Make certain that the receptacle is within the reach of the pump's
power supply cord. DO NOT USE AN EXTENSION CORD.
Extension cords that are too long or too light do not deliver
sufficient voltage to the pump motor. But more important, they
could present a safety hazard if the insulation were to become
damaged or the connection end were to fall into the sump.
3. Testing for Ground. As a safety measure, each electrical outlet
should be checked for ground using an Underwriters Laboratory
Listed circuit analyzer which will indicate if the power, neutral
and ground wires are correctly connected to your outlet. If they
are not, call a qualified electrician.
4. For electrical safety, it is recommended that a GFCI be in-
stalled.
5. FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP
FROM ITS POWER SOURCE BEFORE HANDLING. Single
phase pumps are supplied with a 3-prong grounded plug to help
protect you against the possibility of electrical shock. DO NOT,
UNDER ANY CIRCUMSTANCES, REMOVE THE GROUND
PIN. To reduce the risk of electrical shock, a properly grounded
receptacle of grounding type must be installed and protected
by a ground fault circuit interrupter (GFCI) in accordance with
national electrical code and local codes.
6. Installation and checking of electrical circuits and hardware
should only be performed by a qualified licensed electrician.
7. Risk of electric shock - These pumps have not been investigated
for use in swimming pool and marine areas.
8. According to the state of California (Prop 65), this product
contains chemicals known to the state of California to cause
cancer and birth defects or other reproductive harm.
®
MAIL TO: P.O. BOX 16347 • Louisville, KY 40256-0347
SHIP TO: 3649 Cane Run Road • Louisville, KY 40211-1961
(502) 778-2731 • 1 (800) 928-PUMP • FAX (502) 774-3624
MODELS 108 and 138
CRAWL SPACE PUMPING SYSTEM
PREINSTALLATION CHECKLIST
®
®
SEE BELOW FOR LIST OF CAUTIONS
1. Check to be sure your power source is adequate for handling
the voltage requirements of the motor, as indicated on the pump
or basin plate.
2. Make sure the pump electrical supply circuit is equipped with
fuses or circuit breakers of proper capacity. A separate branch
circuit is recommended, sized according to the National Electri-
cal Code for the current shown on the pump name plate.
3. Pump should be checked frequently for debris and/or build up
which may interfere with the float "on" or "off" position. Repair
and service should be performed by a Zoeller Pump Company
Authorized Service Station only.
4. A CHECK VALVE MAY BE REQUIRED TO REDUCE UNNEC-
ESSARY CYCLING OF PUMP.
5. Dewatering pumps are not designed or intended for handling
raw sewage.
6. Maximum operating temperature for Crawl Space Drain Pumps
must not exceed 130°F (54°C).
NOTE: Pumps with the "UL" mark and pumps with the "US" mark
are tested to UL Standard UL778. CSA Certified pumps are
certified to CSA Standard C22.2 No. 108.
refer to warraNty page 2.
sectioN: 6.10.060
FM1648
Supersedes
visit our web site:
www.zoeller.com
1109
0107

Advertisement

loading

Summary of Contents for Zoeller CRAWL SPACE 108

  • Page 1 ® PREINSTALLATION CHECKLIST Zoeller Pump Company is one of the oldest and largest pump manufacturers in the U.S. and has a history of supplying innovative products and services to its customers. Through research and development, design, testing and manufacturing, we have been able to bring products to the market that solve problems that plague consumers, industry, and the environment.
  • Page 2: Limited Warranty

    8. DO inspect and test system for proper operations at least every 3 DO NOT carry or lift pump by its power cord. DO NOT use an extension months. cord with this Crawl Space Pumping System. © Copyright 2012 Zoeller Co. All rights reserved.
  • Page 3: Performance Characteristics

    GALLONS LITERS GALLONS FLOW PER MINUTE 009971 LITERS 009897 FLOW PER MINUTE MODEL MODEL Feet Meters Gal. Liters Feet Meters Gal. Liters Shut-off Head: 19.25 ft.(5.9m) Shut-off Head: 23 ft.(7.0m) 009897 009971 © Copyright 2012 Zoeller Co. All rights reserved.
  • Page 4 Figure 2A.2 EXTENSION 38 1/8" GROUND LEVEL COMPLETE INSTALLATION OF DRAIN LINES OR WEEP TILES 20" "SLOTTED" BASIN SK1801 SK1803 Figure 2A.1 Figure 2A.3 © Copyright 2009 Zoeller Co. All rights reserved. © Copyright 2012 Zoeller Co. All rights reserved.
  • Page 5 GROUND LEVEL BACKFILL DRAIN LINES OR GRAVEL BACKFILL WEEP TILES "SLOTTED" BASIN GRAVEL "SLOTTED" BASIN PRIMARY PUMP PRIMARY PUMP Figure 4.1 Figure 4.2 SK1807 © Copyright 2009 Zoeller Co. All rights reserved. © Copyright 2012 Zoeller Co. All rights reserved.
  • Page 6: Freezing Protection

    Note: If there is the possibility of the discharge line freezing, then install the discharge line as recommended in Figure 6.1. GROUND FROST LINE DISCHARGE LINE PIPING BACKFILL GRAVEL Figure 6.1 SK1822 © Copyright 2012 Zoeller Co. All rights reserved.
  • Page 7 1010-0786 Extension Kit and Lid 10-0770 Weather Tight Junction Box PUMP 10-1494 Alarm VARIABLE LEVEL FLOAT SWITCH ALARM PANEL "SLOTTED" BASIN SK1858 SK1824 WEATHER TIGHT EXTENSION KIT JUNCTION BOX AND LID SK1823 © Copyright 2012 Zoeller Co. All rights reserved.
  • Page 8: Troubleshooting Guide

    Under flooded conditions, contact your local electric company or a qualified licensed electrician for disconnecting electrical service prior to pump removal. © Copyright 2012 Zoeller Co. All rights reserved.

This manual is also suitable for:

Crawl space 138Z1080001108-0001