Installation
5.4.2

Pressure test

Note
The plant operator is responsible for
performing the pressure test. SAMSON's
After-sales Service can support you to plan
and perform a pressure test for your plant.
NOTICE
!
Risk of regulator damage due to a sudden
pressure increase and resulting high flow
velocities.
Î Slowly open the shut-off valves.
During the pressure test, make sure the fol-
lowing conditions are met:
Î Do not allow the pressure to exceed the
1.5 times the pressure rating of the valve
body.
Î Make sure that the pressure rises simulta-
neously upstream and downstream of the
regulator to avoid damaging it.