Download Print this page

Sage Dual Boiler BES920 Instruction Booklet page 27

Hide thumbs Also See for Dual Boiler BES920:

Advertisement

CARE & CLEANING
Repeat the above process on the left valve.
d)
Empty the drip tray, use caution as the drip
e)
tray may be hot.
Empty water tank, remove water filter.
f)
Dissolve 1 sachet of Sage Descaler
g)
1 litre of warm water. Pour solution into
the water tank.
NOTE
If water tank has not been removed,
replaced or is empty, "FILL TANK"
will appear on the LCD.
3 – Begin Descale
Press 1 Cup button and the LCD screen will
a)
show countdown time (20 minutes).
During this time, the machine will fill boilers
with descale solution and heat to temperature.
There may be some water flow through the
group head during this time.
Allow the countdown timer to reach 0 as this
allows solution sufficient time to dissolve scale
build up. However you can proceed to the next
step at any time by pressing the 1 Cup button.
Place a cloth over the drip tray to stop
b)
steam escaping.
Empty boilers by repeating steps
c)
2c and 2d.
Empty drip tray and insert back to place.
d)
Empty water tank then rinse and fill with
e)
clean water to the MAX line. Lock water
tank back into position.
4 – Flush Boilers
Press 1 Cup button and the LCD screen will
a)
show countdown time (20 minutes).
into
During this time, the machine will fill boilers
with fresh clean water and heat to temperature.
You can proceed to the next step at any time by
pressing the 1 Cup button.
Place a cloth over the drip tray to stop
b)
steam escaping.
Empty boilers by repeating steps
c)
2c and 2d.
Empty drip tray and insert back to place.
d)
Empty water tank then rinse and fill with
e)
clean water to the MAX line. Lock water
tank back into position.
5 – Repeat Step 4 Flush Boilers
We recommend flushing boilers again to
ensure any residual descale solution is
released from the boilers.
Press POWER button to escape the Descale
mode. The descale process is now complete
and ready to use.
27

Advertisement

loading