Central Station Operation - Kidde Gemini II Design, Installation, Operation, And Maintenance Manual

Suppression control panel
Table of Contents

Advertisement

D-1

CENTRAL STATION OPERATION

For Central Station operation, the Kidde Gemini II Main
Control Panel (MCP) must be configured for Central Sta-
tion use through the Configuration Set menu. A Silent Knight
DACT Model 5104 must be wired to the MCP, as shown in
Figure D-1. Refer to the Model 5104 Installation Manual for
information regarding connection of the DACT to telephone
lines for Alarm and Trouble transmission(s).
Note: Central Station is not suitable for use with Cana-
dian applications.
NO
C
NC
TB4
NO C NC
ALARM RELAY
TROUBLE RELAY
CONTACTS
CONTACTS
MAIN CONTROL PANEL PCB
November 2002
APPENDIX D
CENTRAL STATION OPERATION
Figure D-1. Wiring for DACT
firealarmresources.com
SILENT KNIGHT DACT
4.7K
8
9
10
4.7K
11
12
D-1
Kidde Gemini II System
MODEL 5104 PCB
18
17
ZONE 3
16
ALARM
15
14
ZONE 4
13
TROUBLE
06-235975-001

Advertisement

Table of Contents
loading

Table of Contents