Cable Management
1)
Tip the Docking Station to a position that is comfortable to work with.
2)
Install all cables that are necessary for computing needs.
3)
Use Zip Ties (Hardware Kit Item 1) to strain relieve cables at rear of
Docking Station.
IF SECURING EXTERNAL ANTENNAS TO DOCKING STATION
LEAVE AN ADEQUATE SERVICE LOOP BETWEEN THE ANTENNA CONNECTOR AND THE FIRST ZIP TIE
ON THE DOCKING STATION TO ENSURE LATCHING AND UNLATCHING MOTION IS NOT RESTRICTED.
4)
Gather all cables to one side and tie off to unused holes on underside
of Docking Station.
Insert as many zip ties as
necessary to secure cables.
www.havis.com • 1-800-524-9900
(DS-PAN-411-2, DS-PAN-412-2, PKG-DS-PAN-412-2)
7