Routing The Blower Belt Into The Blower Assembly - Toro Z Master 2000 Series Operator's Manual

Twin soft bagger
Hide thumbs Also See for Z Master 2000 Series:
Table of Contents

Advertisement

1
2
3
4
5
Figure 18
Bag Installation
1. Hood
2. Notched-bag bracket
3. Hopper-support frame
2. Align the mount tab of the bag assembly with the
notched-bag bracket
3. Lower the bag assembly until the bag tab is fully seated
in to the notched bracket
4. Repeat steps
1
and
2
5. Lower the bagger hood over the bags
6. Align the hole in the hood latch with the hood
hold-down rod.
(Figure
7. Push the hood latch forward until the end of the hood
rod has passed through latch as shown in
G018362
4. Mount tab
5. Bag
(Figure
18).
(Figure
18).
for the other bag
(Figure
18).
(Figure
18).
19).
Figure
9
Routing the Blower Belt into
the Blower Assembly
Parts needed for this procedure:
1
Blower (from the blower and drive kit)
1
Blower belt (from the blower and drive kit)
Procedure
1. Install the belt around the blower pulley
Figure
21).
G018368
19.
1. Drive pulley
2. Blower belt
16
1
2
3
Figure 19
1
Figure 20
Blower Belt Routing
3. Blower pulley
4. Idler/tension pulley
g018363
(Figure 20
and
4
3
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

48in e-z vac, 52in e-z vac60in

Table of Contents