Installation Tools; Accessories; Pre-Installation Checklist - H3C SecPath F10X0 Installation Manual

Hide thumbs Also See for SecPath F10X0:
Table of Contents

Advertisement

Installation tools

All installation tools are user supplied.
Flat-head screwdriver
ESD wrist strap

Accessories

Mounting bracket
for the F1005 and
F1010
Rubber feet
Console cable

Pre-installation checklist

Table1-4 Checklist before installation
Item
Installation
site
Phillips screwdriver
Marker
Mounting brackets (including M4
shoulder screw) for other F10X0
models than F1005 and F1010
Power cord retainer clip
Requirements
Ventilation
Needle-nose pliers
M4 screw
Power cord
Workbench mounting—Ensure a minimum
clearance of 100 mm (3.94 in) around the air inlet and
outlet vents of the chassis.
19-inch rack mounting—Ensure a minimum
clearance of 80 mm (3.15 in) around the air inlet and
outlet vents of the chassis and a distance of 1U
(44.45 mm, or 1.75 in) between the chassis and other
devices.
A good ventilation system is available at the
installation site.
6
Diagonal pliers
M6 rack screw and cage nut
(shipped with the F1005
and F1010 firewalls and
user supplied for other
models)
Grounding cable
Result

Advertisement

Table of Contents
loading

Table of Contents