Download Print this page

Extron electronics PoleVault Systems PVS 300 Installation Manual page 28

Polevault systems

Advertisement

Stage Three — Install the PV SI 3C LP Ceiling Speakers
Stage 3
This stage involves installing the devices shown below.
Plenum Cover
Doglegs (4)
Where it goes:
What it does:
Speaker Installation:
• Speaker cable (connects ceiling speakers to the PVS 204SA switcher)
2-16
PoleVault Systems Installation • Installation — Stage 3
PV SI 3C LP Ceiling Speakers
PV SI 3C LP Speakers (2)
Speaker
Grills (2)
Installs in ceiling tiles at predetermined location for best acoustics. Connects to switcher.
Receives and outputs audio signal from PVS 204SA switcher
Seismic Tab
V-rails Tabs
V-rails (4)
C-Rings (2)
Cables
Fitting
screws (8)
SPK 18, 25'

Advertisement

loading