Floor Frame Connection - Insignia Sauna Series Installation Manual

Hide thumbs Also See for Sauna Series:
Table of Contents

Advertisement

Step 2 — Connecting the floor frame
Once in position screw the floor frame
in position using ST25 Screws. The
frame will have holes pre-made to
accept the screws for securing.
10 x 25mm Screws
www.insigniashowers.com
Locate the metal floor frame and position around the
floor. The front corners will meet flush at a 45° angle.
Last Modified: 03/03/2022
07

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sauna ky1600

Table of Contents