Gas Connection; Air Supply/Flue Gas Connections - Baxi PRIME Series Installation Manual

Condensing gas wall-hung boilers
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
6.4

Gas connection

Tighten the boiler gas connection with care (maximum tightening torque 30 Nm).
Connect the gas pipe to the gas inlet connector of the boiler. Mount a gas on-off valve on this pipe, directly under the boiler.
Before starting work on the gas pipes, close the main gas tap. Before assembly, check that the gas meter is of sufficient
capacity. Take into account the consumption of all domestic appliances. If the meter is not of sufficient capacity, inform the
local energy provider.
The gas pipe must be connected in compliance with the standards in force. Make sure that there is no dust, water or other in
the gas pipe. If there is, blow into the pipe and shake it vigorously. It is advisable to install a suitable filter on the gas pipe to
prevent clogging of the gas valve.
6.5

Air supply/flue gas connections

BEFORE INSTALLATION, REMOVE THE PLASTIC PLATE ON THE FLUE
OUTLET HOLE AFTER FILLING THE SIPHON AS DESCRIBED IN SECTION
6.7.
The boiler is easy and flexible to install thanks to the range of available connectors,
as described below. The boiler has been designed for connection to a vertical or
horizontal concentric flue/air duct, or separate flue/air ducts using the relative
components. The flue gas connector in the packaging differs depending on the
target market.
For optimal installation, the accessories supplied by the manufacturer
should be used.
To optimise operating safety, make sure the flue ducts are firmly fixed to the wall with suitable brackets. The brackets must be
positioned over the joints at a distance of approximately 1 metre from one another.
7696306 (01-12/17)
22
BO-0000017
BO-0000031

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prime 1.24Prime 26Prime 30

Table of Contents