The water in the system must meet these requirements:
Details
Level of acidity (untreated water)
Level of acidity (treated water)
Conductivity at 25 °C
Chlorides
Other components
Total hardness of the water
5.2.3
Pump capacity/head
This is a two-speed (85% CH and 100% DHW) high static head pump fit for installation on any type of single or double-pipe CH
system. The automatic air valve incorporated in the pump allows quick venting of the heating system.
Q
FLOW
85 %
H
HEAD
100 %
6,0
5,5
5,0
4,5
4,0
3,5
3,0
2,5
2,0
1,5
0
200
5.3

Choice of the location

Before installing the boiler, identify the point of installation taking into account:
• the regulations;
• the overall size of the device;
• the position of the hydraulic and gas supply fittings;
• the size of the flue and air duct fittings (leave sufficient space to ensure ease of installation as illustrated in figure - type of
fittings A-B-C).
• installation of the boiler on a solid wall able to take the weight of the device with a full load of water and fitted with any
accessories;
• installation of the boiler on a flat wall (maximum permitted angle 1.5°).
Unit
pH
pH
μS/cm
mg/litre
mg/litre
°F
°dH
mmol/litre
Default speed
Maximum settable value
100%
85%
400
600
800
Q (l/h)
Total system power
≤ 70 kW
7 - 8.5
0.5 - 20.0
0.1 - 3.5
1000
BO-0000050
15
7 - 9
≤ 800
≤ 150
< 1
1 - 35
7696306 (01-12/17)