Setup - Graco ToughTek S340e Operation, Repair, And Parts

Portable stucco pump
Hide thumbs Also See for ToughTek S340e:
Table of Contents

Advertisement

Setup

To avoid tipping over, ensure cart is on a flat and level
surface. Failure to do so could result in injury or
equipment damage.
1. Turn the motor power switch (S) to OFF.
2. Ground sprayer (see Grounding, pg. 12). Plug the
power cord into a dedicated circuit. See Power
Requirements, pg. 12.
3. Check Throat Seal Liquid (TSL) level in packing nut
(D). Fill 1/2 full with TSL.
4. Connect air supply to applicator.
3A3437G
5. Attach check valve (optional). Remove fluid outlet
assembly (F). Attach check valve (M) to pump fluid
outlet. Attach fluid outlet assembly to check valve
(M) outlet.
NOTE: If a check valve (M) is being used, it must be
installed between the fluid outlet assembly (F) and the
pump lower to ensure proper operation of the pressure
relief valve.
NOTE: Check valve (M) is intended for use with low
viscosity fluids such as water resistive barriers.
6. Attach hose to applicator fluid inlet and pump fluid
outlet (F), then secure Velcro straps (V) around the
cam fitting.
7. Prime the system with water before using (see
Prime with Water, pg. 16).
Grounding
13

Advertisement

Table of Contents
loading

Table of Contents