Download Print this page

H3C SecPath M9000 Quick Manual page 2

Switching fabric module
Hide thumbs Also See for SecPath M9000:

Advertisement

Manual version: APW100-20200316
IMPORTANT:
An M9016-V gateway requires a minimum of three switching fabric modules, and slots 10 and 11
must be installed with switching fabric modules.
4 LEDs
The module provides LEDs to show its operating status.
Table 2 LED description
LED
Status LEDs
5 Installing and removing the module
CAUTION:
Wear a reliably grounded ESD wrist strap when installing and removing the module.
Installing the module
5.1
1.
Face the rear panel of the device.
2.
Remove the filler panel from the target slot.
This example installs the module in slot 10 on an M9016-V gateway.
3.
Place the module horizontally with the component side facing up. Fully open the ejector levers
of the module and then gently push the module into the slot along the guide rails.
4.
Continue to push the module on the middle part of the front panel until the ejector levels touch
the slot edges.
Status
RUN
ALM
Flashing (0.5 Hz)
Off
Off
On
Flashing (0.5 Hz)
On
Off
Off
On
Off
Description
The switching fabric module is operating properly.
The switching fabric module is faulty.
The temperature of the switching fabric module has
exceeded the upper or lower limit.
The switching fabric module has not started.
The switching fabric module is starting up.
ii
BOM: 3123A1Y9

Advertisement

loading

This manual is also suitable for:

Nsqm1fab08e0