Download Print this page

Backyard Discovery Monterey 6012 Manual page 36

Advertisement

G2 - GROUND BOARD - W102438
(2)
1"x5 1/4"x43 3/4" (24x134x1110)
G3 - WALL RAIL - W102441
(1)
1"x5 1/4"x43 3/4" (24x134x1110)
STEP 3
STAND UP UPRIGHT ASSEMBLIES AND ATTACH G2 GROUND BOARDS TO E1 & E2
UPRIGHTS USING 4 1/4" BOLTS, LOCK WASHERS, AND 5/16" T-NUTS.
ATTACH M4 WALL RAIL TO E2 UPRIGHTS USING 4" BOLTS, LOCK WASHERS, AND 5/16"
T-NUTS.
ATTACH H2 FLOOR SUPPORT TO E2 UPRIGHTS USING 3" BOLTS, LOCK WASHERS, AND
1 3/4" BARREL NUTS.
ATTACH G3 WALL RAIL TO E2 UPRIGHTS USING 4 1/4" BOLTS, LOCK WASHERS, AND
5/16" T-NUTS IN BOTTOM HOLES AND 3" BOLTS, LOCK WASHERS, AND 1 3/4" BARREL
NUTS IN TOP HOLES.
USING M21 AS A TEMPLATE, PILOT DRILL USING 1/8" DRILL BIT AND ATTACH M21 WALL
RAIL TO E1 UPRIGHTS 22 15/16" FROM BOTTOM OF G2 GROUND BOARD USING 2" LAG
SCREWS AND 8X19 LOCK WASHERS.
ATTACH G8 & H8 BOARDS TO E4 & E5 SUNDECK UPRIGHTS USING 3" BOLTS, LOCK
WASHERS, AND 1 3/4" BARREL NUTS.
G3
E2
M4
G8 - CENTER ARCH WALL RAIL - W102504
(1)
1"x5 1/4"x43 3/4" (24x134x1110)
H2 - FLOOR SUPPORT - W102439
(1)
1"x3 3/8"x43 3/4" (24x86x1110)
E5
H2
E1
E2
G2
H8 - WALL RAIL - W102507
(1)
1"x3 3/8"x43 3/4" (24x86x1110)
G8
H8
E1
M21
G2
M4 - WALL RAIL - W102443
(1)
5/8"x3 3/8"x43 3/4" (16x86x1110)
M21 - WALL RAIL - W102514
(1)
5/8"x3 3/8"x43 3/4" (16x86x1110)
BOLT WH
(10)
5/16x3
BOLT WH
(10)
5/16x4-1/4
LAG SCREW
(2)
WH 5/16x2
BOLT WH
(2)
5/16x4
T-NUT 5/16
(12)
WASHER
(24)
LOCK EXT
WASHER
8x19
(10)
LOCK EXT
12x19
NUT BARREL
(10)
WH 5/16x1-3/4
E4

Advertisement

loading