GE Zoneline AZ75E09DAC Owner's Manual And Installation Instructions page 15

Vertical air conditioners, cool only, heat/cool and heat pump models
Hide thumbs Also See for Zoneline AZ75E09DAC:
Table of Contents

Advertisement

Available languages

Available languages

UNIT INSTALLED THROUGH FRONT OF CASE
Top View
Architectural Louver
"
11
1
2
10"
10"
duct
3"
min.
Unit
4" min.
front
Door/access panel
• 4" min. from front of case – Unit
installed through FRONT of case.
• 5" min. from front of case – Unit
installed through SIDE of case.
• 3" min. from two sides of case.
Option 1
Access panel with
return air grille
Option 2
Return air grille
A
B
A Minimum recommended access door width: 30"
B Minimum recommended access door height: 50"
Installation Instructions
TYPICAL UTILITY CLOSET AND DIMENSIONS
(FOR REFERENCE ONLY)
3" min.
Rigid
Inside wall
ductwork
Flexible or
rigid duct
Air discharge
outlet
31"
Platform: 23
8" min.
for drain
Min. load capacity: 175 lbs.
access
UNIT INSTALLED THROUGH SIDE OF CASE
3"
min.
Side View
Unit
Wall
plenum
Wall plenum
divider
Filter bracket
"
Drain fittings
3
4
Secure platform
to the floor
" x 23
" square
1
1
4
4
Platform
15
Top View
Architectural Louver
"
11
1
2
3" min.
10"
duct
10"
Unit front
5" min.
Outside wall
14" min. – Required only if optional Hydronic
Heating Kit (RAVHW1, RAVHW2, RAVHW3) is to
be installed. Clearance for installation should be
taken into consideration if this kit is to be used.
Plenum
cutout
" H
Exterior/Outside
32
1
4
x 20" W
Bottom of case approx. 2"
above bottom of plenum
Bottom of case approx. 2"
above bottom of plenum
Outside wall
Door/access panel
Wall plenum
Field supplied
outer flashing

Advertisement