Installation - ABB GE ReliaGear AMP1 Installation Instructions Manual

Table of Contents

Advertisement

26
A M P 1 I N T E G R AT E D P O W E R A N D E N E R G Y I N S TA L L AT I O N I N S T R U C T I O N S
AMP1

Installation

Disconnect power prior to installation.
Reinstall any covers that are displaced during the
installation before powering the unit.
Mount the meter in an appropriate electrical
enclosure near equipment to be monitored.
Do not install on the load side of a Variable
Frequency Drive (VFD).
DIN rail mounting
1. Attach mounting clips to the underside of the housing by
sliding them into the slots from the inside. The stopping
pegs must face the housing, and the outside edge of the
clip must be flush with the outside edge of the housing.
2. Snap the clips onto the DIN rail. See diagram of the
underside of the meter. (Figure 7).
3. To prevent horizontal shifting across the DIN rail, use two
end stop clips.
Figure 7.
DIN rail mounting
Insert clips from inside
For troubleshooting or service related questions, contact ABB at 800-782-8061 or at epis.component.support@abb.com
Screw mounting
1. Attach the mounting clips to the underside of the housing
by sliding them into the slots from the outside. The
stopping pegs must face the housing, and the screw hole
must be exposed on the outside of the housing.
2. Use three #8 screws (not supplied) to mount the meter to
the back of the enclosure. See diagram of the underside of
the meter. (Figure 8).
Figure 8.
Screw mounting
Insert clips
from outside
Clip flush with
outside edge
Snap onto DIN rail
Screw holes exposed
for mounting

Advertisement

Table of Contents
loading

Table of Contents