32
A M P 1 I N T E G R AT E D P O W E R A N D E N E R G Y I N S TA L L AT I O N I N S T R U C T I O N S
AMP1N4
Installation
3. Install the AMP1 meter onto DIN rail inside the AMP1N4
Run meter wiring through the holes drilled previously. Wire
the meter according to the instructions in the meter
installation guide.
Push the top of the meter onto the DIN rail.
Push the bottom of the meter onto the DIN rail until there is
an audible click.
If necessary, remove the meter from the DIN rail using a flat
screwdriver to pry out the bottom (black) clip while lifting
out the bottom of the meter
For troubleshooting or service related questions, contact ABB at 800-782-8061 or at epis.component.support@abb.com
Lower the four brackets so that the swing panel cover can
be attached using the enclosed hardware.