C
h
a
p
t
e
r
3
C
h
a
p
t
e
r
3
G
e
t
t
i
n
g
S
G
e
t
t
i
n
g
S
Once the site for your glove box is properly prepared, you are ready to
unpack, inspect, install, and validate performance of your system. Read this
chapter to learn how to:
• Unpack and move the glove box.
• Set up the glove box with the proper supporting structure and work
surface.
• Connect an exhaust system to the pressure relief valve (if applicable).
• Install the gloves.
• Connect the electrical supply.
• Connect the plumbing lines for gas, vacuum, and drying train.
• Validate performance of the glove box.
Each Precise Glove Box model weighs 185 lbs. each (83
!
kg). The shipping container allows for lifting with a
mechanical lift truck or floor jack. If you must lift the
glove box manually, follow safe-lifting guidelines. Do not
lift by the upper sheet metal façade and front panel as
damage can occur to the glove box liner.
6
:
:
t
a
r
t
e
d
t
a
r
t
e
d
Product Service 1-800-522-7658
Need help?
Do you have a question about the Precise CA 5220100 and is the answer not in the manual?
Questions and answers