Basic Link and Channel Connections

The cable links you test may or may not include equipment patch cables and extra
transition connections in the telecommunications closet and work area. For
example, cable installers are often responsible only for the permanent cable
installed between the closet and the first wall outlet in the work area. This segment
of cable is the basic link, shown in Figure 7-4. As defined in TSB-67, the basic
link consists of up to 90 m of horizontal cable, one transition connector at each
end, and two test equipment patch cables of no more than 2 m each.
Start
basic link
Test Tool
Horizontal cabling
Test equipment
patch cable
Basic link
Figure 7-4. Basic Link Test Connections
Basic Cable Testing
Basic Link and Channel Connections
Patch panel
connection
Test equipment
patch cable
Smart
Remote
7
End
basic link
TALK
oy73f.eps
7-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cableanalyzer dsp-4000Cableanalyzer dsp-4100Cableanalyzer dsp-4000srCableanalyzer dsp-4100sr

Table of Contents