MacDon 5020 Operator's Manual page 44

Power tongue windrower
Table of Contents

Advertisement

MAINTENANCE/SERVICE
GREASING THE WINDROWER (continued)
50 Hours:
1. Main Drive Shaft Bearings (A) & (B)
4. Roll Shaft Bearings (G) & (H) - four fittings
- two fittings
B
H
G
A
LEFT SIDE
RIGHT SIDE
MAIN DRIVE SHAFT BEARINGS
ROLL SHAFT BEARINGS
2. Reel Shaft Bearings (C) & (D) - two fittings
C
E
REEL SHAFT BEARING - LEFT SIDE
3. Auger Shaft Bearings (E) & (F) - two fittings
D
REEL AND AUGER BEARINGS - RIGHT SIDE
F
AUGER SHAFT BEARING - LEFT SIDE
Form # 147008
Issue 12/05
42

Advertisement

Table of Contents
loading

Table of Contents