3-12.
VF Assembly
Preparation
1.
Remove the cabinet (G) assembly. (Refer to
2.
Remove the heat sink (GP) assembly. (Refer to
3.
Remove the top cabinet assembly. (Refer to
4.
Remove the EF-1003 board. (Refer to
5.
Remove the IR cabinet assembly. (Refer to
6.
Remove the inner mold (T) assembly. (Refer to
7.
Remove the cabinet (R) assembly. (Refer to
8.
Remove the BT panel assembly. (Refer to
9.
Remove the ZM-1005 board. (Refer to
Procedure
1.
Remove the ZM frame.
(1) Remove the two screws.
(2) Release the boss and hook, and then remove the ZM frame.
ZM frame
Precision screws
(P1.7 x 4)
HXR-NX80/HXR-MC88
"3-2. Cabinet (G)
"3-3. Heat Sink (GP)
"3-5. Top Cabinet
"3-6. EF-1003
Board".)
"3-7. IR-1009
"3-8. Inner Mold (T)
"3-9-1. Cabinet (R)
"3-10-1. BT Panel
"3-11. ZM-1005
Boss
Hole
Hole
Hook
Assembly".)
Assembly".)
Assembly".)
Board".)
Assembly".)
Assembly".)
Assembly".)
Board".)
3-39