Pressure Relief Procedure - Graco XM Installation-Parts

Plural-component oem sprayer
Table of Contents

Advertisement

Pressure Relief Procedure

Pressure Relief Procedure
Follow Flush Mixed Material procedure prior to reliev-
ing pressure.
Follow Pressure Relief Procedure when you stop
spraying or dispensing; and before cleaning, checking,
servicing, or transporting equipment.
Relieve A and B Fluid Pressure
1. Engage trigger lock.
2. Press Stop
.
3. If fluid heaters are used, shut them off.
4. Shut off feed pumps, if used.
.
5. Remove spray tip and clean.
6. Disengage trigger lock.
7. Hold a metal part of the gun firmly to a grounded
metal pail with a splash guard in place. Trigger gun
to relieve pressure in material hoses.
14
ti1949a
ti1950a
ti1953a
8. Engage trigger lock.
Relieve Pump Fluid Pressure and Flush Mix
Hose
9. Close mix manifold valves (AH, AJ), then open sol-
vent flush valve (AK) on mix manifold.
AH
10. Open solvent flush ball valve (CB). Use lowest pres-
sure needed to flush material out of hose.
CB
11. Disengage trigger lock.
ti1949a
AK
AJ
ti1950a

Advertisement

Table of Contents
loading

Table of Contents