Section 3 Inspection and Installation
Before unpacking the unit, first check for
damages in the package of the unit.
Then unpack the unit. Check carefully to
see if there were damages incurred
during transit.
3.1 Packing List
Table -1. Packing List
Description
Catalog Number
Digital Tube Rocker
88882017
Rubber Mat
1
(Installed)
Power Adapter
1
120V
Multi-Power
N/A
Adapter 220V
3
Section 3 | Inspection and Installation
After unpacking, check that all unit parts
and accessories are as listed below.
Contact us or the agent from which you
purchased the unit if any components
were omitted.
Figure
88882018
1
N/A
1
3.2 Connections
Power Adaptor
3.3 Structure Diagram
Control Panel
Foot (4)
Main Body
Tray
Rubber Mat
Power Swtich
Housing
Digital Tube Rocker
4