Tar River SRB-870 Owner's Manual page 15

Mini round baler
Hide thumbs Also See for SRB-870:
Table of Contents

Advertisement

Mini Round Baler SRB-870
Assembly
Threading the twine:
The twine is located in the twine storage compartment of the baler (located in the front of the baler). This baler
can handle up to two rolls of twine at a time.
If using two rolls of twine, find the leading edge of roll 2 (usually found under the twine's label). Next find the
end of roll 1 and join the two rolls with a knot. Be sure to tie a knot small enough to not jam the mechanism or
break the twine.
Routing twine:
Step 1: Feed the leading end of twine through the "Twine Guide".
Twine Guide
Twine Guide
Roll 1
Roll 2
Single Roll Routing
Double Roll Routing
Step 2: Feed twine through the RH wall of twine storage compartment as shown below.
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents