• Before service, shut off the fuel supply and turn off the power to the
burner.
• Leak checks must be performed during installation and service to
prevent fuel leakage.
• Care should be taken by the installer to ensure that no electrical cables
or fuel lines are crushed or otherwise damaged during installation or
service.
• If the boiler is equipped with an access hatch, this must be equipped
with a hatch opening switch connected to the burner's safety system.
• When in operation, the burner's noise level can exceed 85 dBA.
Use hearing protection.
• The burner must not be put into operation without proper safety and
protection devices.
• Fire extinguisher with Class BE recommended.
• Modifying the design or using accessories that have not been
approved by Enertech in writing is strictly prohibited.
• Prior to operation, the following points must be checked:
- fi tting and installation work has been completed and approved
- electrical installation has been correctly performed
- fl ue gas ducts and combustion air ducts are not blocked
- all actuators and control and safety devices are in working order and
correctly set
• After commissioning
- If the gas burner control has a solid red light, contact your installer.