To Unpack A Benchtop System; Inspecting The System - Agilent Technologies E5505A Installation Manual

Phase noise measurement system
Table of Contents

Advertisement

1
General Information
Do not stand in the path of a system being moved down the incline of the cabinet
WA R N I N G
ramp.

To unpack a benchtop system

To unpack an E5505A benchtop system, you need the following tools:
• Safety glasses
• Sturdy scissors
Retain all packing material—crate, pallet, boxes, foam, etc.—for future use should you
N O T E
need to move the system to another location.
Always wear safety glasses or goggles when cutting plastic straps from the
WA R N I N G
shipping container. These straps are under tension and when cut can snap and
cause injury to unprotected eyes.
1
2
3

Inspecting the system

After unpacking a racked or benchtop system, the next step is to inspect
the shipping container and its contents thoroughly to ensure that nothing
was damaged during shipment.
If the container or packing material is damaged, the contents should be checked both
N O T E
mechanically and electrically. If the contents are damaged or defective, contact your
customer engineer through your local Agilent Technologies Service Center. Keep the
shipping materials for the transport company's inspection.
For instructions on removing an instrument from the system, see
Appendix A
Verify that all parts and materials are included in your shipment:
• E5500 Phase Noise Measurement System software and documentation
• E5500 Software Keyword Licence Certificate
• Recovery media kit for Microsoft® Windows XP Pro®
10
Cut and remove the plastic straps that secure the shipping container
and lift the lid.
Remove and open the individual shipping boxes.
Carefully remove the contents from each box.
for return procedures.
CD- ROM
Chapter
6. See
E5505A Installation Guide

Advertisement

Table of Contents
loading

Table of Contents