Mira Go Thermostatic Power Shower Installation And User Manual page 18

Table of Contents

Advertisement

The unit must not be run dry. Before proceeding any further with the installation the
shower unit must be commissioned.
1.
Connect the flexible hose to the outlet
of the shower unit.
Caution! Do not over tighten.
2.
Turn on the water supplies and check
for leaks.
3.
Switch on the electrical supply.
4.
Tu r n t h e o u t e r f l o w c o n t r o l
anticlockwise
5.
Rotate the inner temperature control
anticlockwise to check the hot supply
and clockwise to check the cold
supply.
6.
Turn the flow control
OFF position.
7.
T h e
s h o w e r
commissioned.
1079321-W2-G
COMMISSIONING
to full flow.
clockwise to the
u n i t
i s
n o w
Hose Washer
Hose
Maximum
Flow Position
Temperature Indicator
Warmer
Inner Temperature
Control
Outer Flow Control
18
Outer Flow Control
Cooler
OFF Position

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1.1532.327

Table of Contents