19.
Refit the unit cover and secure with
the three cover securing screws.
20.
Insert the flow control knob in the OFF
position.
21. Insert the temperature indicator trim
and the inner temperature control
knob.
22. The power thermostatic shower will
now require commissioning, refer to
COMMISSIONING.
23.
Install the shower fittings, refer to the
instruction manual supplied with the
fittings.
Temperature
Indicator Trim
17
OFF Position
Temperature
Control Knob
Arrow / OFF
Position
Inner
Temperature
Control Knob
1079321-W2-G