Mira Go Thermostatic Power Shower Installation And User Manual page 14

Table of Contents

Advertisement

7.
Temporarily locate the shower unit.
8.
Position the shower unit on the wall
and mark the three fixing points.
Note! Installers may wish to obtain
alternative proprietary cavity fixings
for dry lined, stud partition or dry
partition wall structures.
9. Use the push-fit release tool to push
the grey collars into the manifold to
release the shower unit from the
supply pipes.
Warning! Make sure there are no
buried cables or pipes near the fixing
points before drilling.
10. Drill 9.5 mm holes and fit the wall
plugs supplied.
11. Cut away and trim the thinned
section at the top or bottom of the
case to allow the electrical supply
cable to run down the rear of case.
1079321-W2-G
14
Fixing Points

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1.1532.327

Table of Contents