Mira Go Thermostatic Power Shower Installation And User Manual page 12

Table of Contents

Advertisement

Warning!
Do not fix the shower unit to the wall until plumbing and electrical
installations have been completed.
1.
Decide on a suitable location for
the shower unit avoiding buried
cables and pipes. The unit should be
positioned at a height convenient for
all the family (at least 200 mm below
the ceiling to allow for the fitting and
removal of the unit cover).
The handset should spray away from
the shower unit, either down the
centre line of the bath or across the
shower cubicle opening. Make sure
when the hose retaining ring is placed
on the lowest position on the slide bar,
the handset does not fall below the
minimum clearance gap, between
the bath or shower tray spillover level
of 25 mm.
2.
Hot and cold inlet supply connections
are:
Hot – Left
Run the hot and cold water supply
pipes at 28 mm centres, make sure
that the pipe ends project 30 mm into
the inlet manifold.
Warning! Supply connections must
not be connected in reverse.
Caution! Do not use stainless steel
piping for inlet pipework.
Caution! If the pipework is chrome
plated remove all traces of chrome
from the connecting surfaces. If the
chrome is not removed then the
inlet manifold collets will not grip the
supply pipe.
1079321-W2-G
Cold – Right
Spillover level
30
All dimensions in millimetres
12
Hose Retaining Ring
25 mm Minimum
Miniature Trunking
275
28
H
C
30

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1.1532.327

Table of Contents