Vermont Castings Intrepid INDVRBDSB Installation & Operating Manual page 22

Direct vent gas heater
Hide thumbs Also See for Intrepid INDVRBDSB:
Table of Contents

Advertisement

Round Ceiling
Support / Wall thimble
Pipe Section
Figure 3.19
Rear Vent
ST975
Use components listed under "Approved Vent System
simpson
Components" under 'Basic Straight through-the-Wall
Installation' for an installation where the heater is parallel to
straight up
the wall and the vent system extends straight back through
8/07
that wall.
1. Locate the vent opening on the wall. Refer to Figures 3.20
& 3.21 to determine the top of the opening centerline. It
may be necessary to first position the stove and measure
to find the hole location. Depending on whether the wall
is made of combustible materials, cut the opening to the
size shown in Figure 3.20. Combustible wall openings
must be framed as shown in Figure 3.20.
2. Measure the wall thickness and cut the zero clearance
sleeve sections to proper length (MAXIMUM 12").
Assemble the sleeve with the #8 sheet metal screws
supplied. Attach the firestop plate to the sleeve end with
the holes, Figure 3.22. NOTE: The zero clearance sleeve
is required in combustible walls only.
2222
Vertical
Termination Cap
(shown)
Storm Collar
Roof
Flashing
Ceiling Firestop
Cathedral Ceiling
Support Box
90°Elbow
Vermont Castings • Intrepid DV-IFT Owner's Manual_R20 • 11/21
Vent Opening - Combustible Wall
10"
(254 mm)
10"
(254 mm)
Vent Opening - Noncombustible Wall
7¹⁄₂" Dia.
(190 mm)
Figure 3.20 - Locate vent opening. NOTE: Zero clearance sleeve
is required for combustible wall installations.
10" x 10" (254 x 254 mm)
Wall Opening
Zero Clearance
Sleeve - Seal
Around
VO584-100a
Vent Opening
7/07 djt
18-1/4"
(464 mm)
to
Center of
Opening
Seal Around
Terminal
Figure 3.21 - Intrepid minimum horizontal rear vent installation.
3. Install the Wall Firestop/Sleeve assembly into the wall
cutout and fasten the firestop to the wall cutout framing
members, Figure 3.22.
ST950
install pipe thru wall
12"
(305mm)
7/07
Max. Length
Figure 3.22 - Assemble the wall sleeve and firestop.
ZCS103
Zero Clearance Sleeve
& Firestop
12/6/99 djt
Framing Detail
Firestop
Wall Plate
All Components Must
Remain Concentric
Sleeve
#8 Sheet Metal
Screws
Firestop
3-90-30007474

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents