Do A Final Check On The Fireplace - Bellfires Smart Bell Panorama 45/59 MF Installation And Maintenance Manual

Table of Contents

Advertisement

4 4 .3.3

Do a final check on the fireplace

Safety conditions
Procedure
1.
2.
3.
Smart Bell Panorama 45/59
Caution:
Wait 4 weeks after the installation before you use the fireplace. The cement
needs to harden. A final check on the fireplace can be done directly after the
installation.
Start the appliance and do a check on the ignition of the pilot light and main burner.
The ignition must be quiet and must produce a calm flame. To start the appliance,
refer to the user manual.
Do a check on the main burner. The flames increase in height and change from blue/
yellow to yellow.
If all flames are yellow, the appliance is ready for use.
Installation
27

Advertisement

Table of Contents
loading

Table of Contents