To Shut Down - Flagro F-1000T Operating Instructions Manual

Dual fuel construction heater
Hide thumbs Also See for F-1000T:
Table of Contents

Advertisement

F-1000T START UP INSTRUCTIONS:
1. Set fuel selector valve according to gas supply
to be used
2. Connect construction heater to gas supply with
approved hose assembly.
3. Plug the electrical cord into a 20 amp supply.
4. Open all gas supply valves.
5. Depress the main switch to the "START" position.
The fan will start and the burner should ignite.
6. Set the Thermostat to the desired temperature.
7. If heater fails to ignite after 3 attempts call your
supplier for service.

TO SHUT DOWN:

1. Close the main gas supply valve while the heater
is operating.
2. Move the main switch to the "OFF" position.
3. Disconnect the heater from gas supply.

Advertisement

Table of Contents
loading

Table of Contents