Fetco Extractor TBS-21A User Manual page 5

Iced tea brewer iced tea / coffee brewer
Hide thumbs Also See for Extractor TBS-21A:
Table of Contents

Advertisement

Final Setup
1. Turn on the incoming water supply line and inspect both inside and outside of the brewer for leaks in all
fittings and tubes
2. Turn on the incoming power.
3. Turn on the brewer's main power switch.
4. Within 6 seconds, the hot water tank will begin filling until the water is sensed by the probe at the top of the
tank.
5. The heaters will be disabled by the control board until the tank is full.
6. The brewer will be ready for operation as soon as the ready light comes on to signify that the water tank is
up to temperature. The time required to reach brewing temperature will vary according to the electrical
configuration ordered.
7. Review the Operating Instructions. Brew one full batch (water only) to confirm proper fill levels. See the
programming instructions to adjust batch settings.
8. Re-attach the covers after one final inspection for leaks. Look closely in the top of the brewer at the
dispense fittings during this inspection.
Operator Training
Review the operating procedures with whoever will be using the brewer. Pay particular attention to the following
areas:
1. Don't remove the brew basket until it has stopped dripping.
2. Make sure the dispenser is empty before brewing into it.
3. Show how to attach covers, close, and or secure the dispensers for transporting.
4. Show the location and operation of the water shut off valve as well as the circuit breaker for the brewer.
5. Steam from the tank will form condensation in the vent tube. This condensation will drip into and then out
of the brew baskets. 1/4 cup discharging overnight is possible. Place an appropriate container under the
brew basket when not in use.
6. We recommend leaving the power to the brewer on overnight. The water tank is well insulated and will use
very little electricity to keep the tank hot. Leaving the brewer in the on position will also avoid delays at the
beginning of shifts for the brewer to reach operating temperature.
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents