Keys To A Successful Installation
If not installed correctly by qualified personnel, the brewer may not operate properly and damage may result.
Damages resulting from improper installation are not covered by the warranty.
Here are the key points to consider before installation:
Electrical:
The electrical diagram is located on the inside of the cover.
The installation must comply with applicable federal, state, and local codes having jurisdiction at your
location. Check with your local inspectors to determine what codes will apply.
Plumbing:
This equipment is to be installed to comply with the applicable federal, state, or local plumbing codes.
The water line must be flushed thoroughly prior to connecting it to the brewer to prevent debris from
contaminating the machine. A water filter is strongly recommended.
Never connect the brewer to a hot water supply. Cold water only.
Verify that the water line will provide at least 1.5 gallons per minute
General:
Utilize only qualified beverage equipment service technicians for installation. A Service Company Directory
may be found on our web site, http://www.fetco.com.
Installation Instructions
Brewer Setup
1. Review the Dimensions for the unit you are installing. Verify that the brewer will fit in the space intended
for it, and that the counter or table will support the total weight of the brewer and dispenser when filled.
2. Place the brewer on the counter or stand.
3. When the brewer is in position, level it front to back
and side to side by adjusting the legs.
Water Connection
1. Water inlet is a 3/8 inch male flare fitting.
2. The brewer must be connected to a cold water supply only. Hot water must never be used.
3. Install a water shut off valve near the brewer to facilitate service. If an in-line water filter is used, it should
be installed after the water shut off valve and in a position to facilitate filter replacement.
4. Flush the water supply line and filter before connecting it to the brewer.
5. Verify that the water line will provide at least 1.5 gallons per minute, and that the water pressure is between
20 and 75 psig.
6. Use a wrench on the factory fitting when connecting the incoming water line. This will reduce stress on the
internal connections and reduce the possibility of leaks developing after the install has been completed.
Electrical Connection
1. Verify that the actual voltage at the electrical service connection is compatible with the specifications on the
brewer's serial number label.
2. The temperature and water tank fill level are pre-set at the factory.
There is no need to turn off the heaters during the installation
process. The heaters are disabled by the control board until the
tank is full of water. The heating process will start automatically
when the tank has filled.

Installation

(For Qualified Service Technicians Only)
Warning: Legs are to be adjusted for
leveling the brewer only. Do not use
for height adjustment or extend them
higher than necessary.
Warning: To prevent
electrical shock, this
unit must be properly
grounded.