3. Amount of refrigerant to be added <PUHY>
The amount of refrigerant that is shown in the table below is factory-charged to the outdoor units.
The amount necessary for extended pipe (field piping) is not included and must be added on site.
Outdoor unit model
Amount of pre-charged re-
frigerant in the outdoor unit
(kg[lbs-oz])
Outdoor unit model
Amount of pre-charged re-
frigerant in the outdoor unit
(kg[lbs-oz])
(1) Calculation formula
The amount of refrigerant to be added depends on the size and the length of field piping. (unit in m[ft])
Amount of added refrigerant (kg) = (0.2 x L
refrigerant (oz) = (2.15 x L
L
: Length of ø15.88[3/4"] liquid pipe (m)
1
L
: Length of ø12.7[1/2"] liquid pipe (m)
2
L
: Length of ø9.52[3/8"] liquid pipe (m)
3
L
: Length of ø6.35[1/4"] liquid pipe (m)
4
α, α' : Refer to the table below.
Total capacity of
connected indoor units
-
30
31
-
60
61
-
126
127
-
180
181
-
234
235
-
264
265
-
366
Round up the calculation result to the nearest 0.01kg. (Example: 16.44kg to 16.5kg)
Round up the calculation result in increments of 4oz (0.1kg) or round it up to the nearest 1oz.
(Example: 540.7oz to 544oz or 541oz)
P72
P96
7.0[15-7]
9.5[20-16]
P168
P192
22.0[48-9]
22.0[48-9]
) + (0.12 x L
1
' ) + (1.29 x L
' ) + (0.65 x L
' ) + (0.26 x L
1
2
3
α(kg)
α'(oz)
1.0
36
1.5
53
2.0
71
2.5
89
3.0
106
4.0
142
5.0
178
- 183 -
P108
9.5[20-16]
13.0[28-11]
P204
22.0[48-9]
22.0[48-9]
) + (0.06 x L
) + (0.024 x L
) + αAmount of added
2
3
4
' ) + α'
4
L
' : Length of ø15.88[3/4"] liquid pipe [ft]
1
L
' : Length of ø12.7[1/2"] liquid pipe [ft]
2
L
' : Length of ø9.52[3/8"] liquid pipe [ft]
3
L
' : Length of ø6.35[1/4"] liquid pipe [ft]
4
[ VIII Test Run Mode ]
P126
P144
13.0[28-11]
P216
P234
22.0[48-9]