[ I Read Before Servicing ]
4. Thickness and refrigerant type indicated on the piping materials
Ask the pipe manufacturer for the symbols indicated on the piping material for new refrigerant.
5. Flare processing (O-material (Annealed) only)
The flare processing dimensions for the pipes that are used in the R410A system are larger than those in the R22 system.
Flare processing dimensions (mm[in])
Pipe size (mm[in])
ø6.35
[1/4"]
ø9.52
[3/8"]
ø12.7
[1/2"]
ø15.88
[5/8"]
ø19.05
[3/4"]
If a clutch-type flare tool is used to flare the pipes in the system using R410A, the length of the pipes must be between 1.0
and 1.5 mm. For margin adjustment, a copper pipe gauge is necessary.
6. Flare nut
Type-2 flare nuts instead of type-1 are used to increase the strength. The size of some of the flare nuts have also been
changed.
Flare nut dimensions (mm[in])
Pipe size (mm[in])
ø6.35
[1/4"]
ø9.52
[3/8"]
ø12.7
[1/2"]
ø15.88
[5/8"]
ø19.05
[3/4"]
The figures in the radial thickness column are based on the Japanese standards and provided only as a reference. Use
pipes that meet the local standards.
A dimension (mm[in])
R410A
9.1
[0.358]
9.0
13.2
[0.520]
13.0
16.6
[0.654]
16.2
19.7
[0.776]
19.4
24.0
[0.945]
23.3
B dimension (mm[in])
R410A
17.0
[0.669]
17.0
22.0
[0.866]
22.0
26.0
[1.024]
24.0
29.0
[1.142]
27.0
36.0
[1.417]
36.0
- 6 -
R22
[0.354]
[0.512]
[0.638]
[0.764]
[0.917]
R22
[0.669]
[0.866]
[0.945]
[1.063]
[1.417]
Dimension B