GEM Q50 eSyStep Operating Instructions Manual page 99

Motorized pinch valve
Hide thumbs Also See for Q50 eSyStep:
Table of Contents

Advertisement

Available languages

Available languages

13.2 Removing the tube
Risk of crushing!
▶ While the tube holder is open, the actu-
ator can move. Severe injury due to
crushing or shearing of the fingers.
Ensure that the actuator remains in the
open position during tube replace-
ment.
Do not reach into the tube crushing
area.
1. Move the actuator A to the open position.
2. Turn the locking ring b by 90° in the direction of the arrow.
ð The word "unlocked" can be read on the tube holder.
3. Open the tube holder 1.
4. Remove the tube.
13.3 Disassembling the tube holder
1. Remove the tube (see "Removing the tube", page 99).
www.gemu-group.com
CAUTION
b
1
2. Loosen the fixing screw c using an Allen key.
3. Remove the tube holder 1.
13.4 Disassembling the compressor
Risk of crushing due to the compressor
shutting down!
▶ Severe injury due to crushing or shear-
1. Remove the tube (see "Removing the tube", page 99).
2. Disassemble the tube holder (see "Disassembling the tube
holder", page 99).
3. Move the actuator A to the closed position.
4. Pull the compressor 2 out downwards.
99 / 108
13 Inspection and maintenance
1
c
CAUTION
ing of the fingers.
Ensure that the actuator remains in the
open position while replacing the com-
pressor.
Do not reach into the tube crushing
area.
2
GEMÜ Q50 eSyStep

Advertisement

Chapters

Table of Contents
loading

Table of Contents