Land Pride GB25 Series Operator's Manual page 25

Table of Contents

Advertisement

Section 2: Operating Procedures
39292
Hook-up Grapple
Refer to Figure 2-1:
1.
Approach grapple towers (#9) with bucket holes "B1"
slightly lower than bucket holes "A1" .
2. Align bucket holes "A1" with grapple holes "A2" .
3. Shut tractor down without changing the front loader
height. See "Tractor Shutdown Procedure" on
page 9.
4. Attach bucket holes "A1" to grapple holes "A2" with
mounting pins (#6) and secure with linchpins (#5).
5. Return to the tractor and rotate bucket up to align
grapple holes "B2" with bucket holes "B1" and to lift
the grapple off the ground 1 to 2 inches.
6. Shut tractor down without changing the front loader
height.
7.
Attach bucket holes "B1" to grapple holes "B2" with
mounting pins (#8) and secure with linchpins (#7).
Refer to Figure 2-2:
8. Remove cotter pin (#3) and pin (#2) from hole B.
9. Rotate park stand (#1) up and secure in place by
inserting pin (#2) in hole "A" .
6/17/21
Table of Contents
Hook-up Grapple To The Bucket
Figure 2-1
10. Secure pin (#2) with hairpin cotter (#3).
11. Repeat steps 8-10 for the other park stand.
12. Connect hydraulic hoses to the tractor duplex outlet.
13. Return to the tractor and rotate Grapple Bucket to the
up-right position.
39291
Series: GB25, GBE25, and GBE30 Grapple Buckets 380-192M
Rotate Park Stands Up
Figure 2-2
21

Advertisement

Table of Contents
loading

Table of Contents