Land Pride GB25 Series Operator's Manual page 15

Table of Contents

Advertisement

Section 1: Assembly & Set-Up
39334
Spill Screen Assembly
Figure 1-3
Spill Screen Assembly
Refer to Figure 1-3:
1.
Attach spill screen (#9) to the left-hand and right-
hand screen mounts (#13) with 1/2"-13 x 1 3/4" GR5
hex bolts (#10), lock washers (#11), and flat
washers (#12).
2. Tighten bolts (#10) to the correct torque.
39335
6/17/21
Table of Contents
Hook-up Hydraulics
Refer to Figure 1-1 on page 10:
1.
Remove and discard port plugs "A" from hydraulic
cylinders (#4).
Refer to Figure 1-4:
2. Attach o-ring end of elbows (#5A & #5B) to ports in
hydraulic cylinders (#11). Do not tighten elbows at
this time.
3. Attach 68" (1.73 m) long hydraulic hoses (#7 & #8) to
elbows (#5A). Tighten hoses to elbow fittings.
4. Attach 81" (2.06 m) long hydraulic hoses (#9 & #10)
to elbows (#5B). Tighten hoses to elbow fittings.
5. Skip to "Counterbalance Valve (Optional)" on
page 12 if included. Otherwise, continue with step 6
below.
6. Attach opposite end of hydraulic hoses (#7 & #8) to
lower tee (#6). Rotate tee as shown and hold in this
position while tightening hoses to the tee.
7.
Attach opposite end of hydraulic hoses (#9 & #10) to
upper tee (#6). Rotate tee as shown and hold in this
position while tightening hoses to the tee.
8. Attach hydraulic hose clamps (#2) to spill screen (#1)
as shown with 5/16"-18 x 1 3/4" GR5 hex head
bolts (#3) and hex nylock nuts (#4). Do not tighten
nuts at this time.
9. Make adjustment to hoses (#7, #8, #9, & #10) and
draw hose clamps (#2) up tight by tightening hex
nylock nuts (#4). Do not crush hoses.
10. Tighten elbow fittings (#5A & 5B) to hydraulic
cylinders (#11).
Attach Hydraulic Hoses & Fitting
Figure 1-4
Series: GB25, GBE25, and GBE30 Grapple Buckets 380-192M
11

Advertisement

Table of Contents
loading

Table of Contents