Method For Replacing Slow-Blow Fuse - Komatsu WA380-8 Operation & Maintenance Manual

Wheel loader
Hide thumbs Also See for WA380-8:
Table of Contents

Advertisement

MAINTENANCE PROCEDURE
1.
Start the engine and set the engine speed to approximate-
ly 1500 rpm.
2.
Press fan switch (1) and set the air flow to "Hi".
3.
Press temperature adjustment switch (2) and set the tem-
perature to 18 °C.
4.
Fully open the doors and windows.
5.
Press air conditioner switch (3) to turn the air conditioner
switch ON.
6.
Check the condition of the refrigerant gas (chlorofluorocar-
bon 134a) that circulates the refrigerant circuit, through
sight glass (5) (inspection window) of air conditioner hose
(4).
A: Quantity of refrigerant
B: Condition viewed through sight glass
a: Appropriate: Just after the air conditioner switch is
turned ON, a small number of bubbles are seen. Then,
the sight glass becomes milky white, and then becomes
pale.
b: Insufficient: After the air conditioner switch is turned ON,
bubbles are seen continuously.
X: State of refrigerant flow
Y: Condition viewed through sight glass
x: Bubbles are seen: Gaseous and liquid refrigerants are
mixed.
y: No bubble: All refrigerant becomes liquid and transpar-
ent.
z: Milky white: Oil and refrigerant are separated and their
mixture is milky white.
MAINTENANCE AND SCHEDULE OF AIR CONDITIONER
Check point
Filter
Condenser
Belt
Refrigerant gas
Piping
Receiver drier

METHOD FOR REPLACING SLOW-BLOW FUSE

NOTICE
When replacing the slow-blow fuse, be sure to turn the starting switch to OFF position and, after
confirming that the system operating lamp is not lit, set the battery disconnect switch key to OFF
position.
Replace the slow blow fuse with the one of the same capacity.
Should the slow-blow fuse is blown, investigate the cause and take necessary actions.
4-34
Check items
Clogging, dirt
Clogging, dirt
Looseness, damage
Charge amount
Looseness, damage,
leakage
-
Maintenance schedule
Check before
6 months in-
operation
spection
Implement
-
Implement
-
Implement
-
-
Implement
-
Implement
-
-
MAINTENANCE
Replacement
interval
2 years
-
2 years
-
-
2 years

Advertisement

Table of Contents
loading

Table of Contents