VLT Installation
Review
10) Which of the following statements is NOT part
Rev.02
of the Pre-Installation Check?
A. Make a Visual inspection of the drive and its
packaging.
B. Insure VLT can handle maximum current of
the motor.
C. Record Motor Nameplate Data
D. Determine if motor is IEC or NEMA rated.
E. Check that motor is wired for RUN.
Confidential / Property of Danfoss Drives A/S
47
North America
Motion Controls