Download Print this page

Danfoss VLT Training Manual page 30

Hide thumbs Also See for VLT:

Advertisement

VLT Installation
4) Installation Checks
4) Installation Checks
c. General Wiring Preparations
Most smaller drives have knock-outs for conduit entry. Larger drives provide a
removable conduit entry plate. It is important to remove this plate before drilling or
punching it.
When a drive is supplied with an auxiliary enclosure, it generally is necessary to drill
or punch conduit entry holes in the auxiliary enclosure. It is important to ensure
that metal chips or filings don't get into any of the devices which are housed in the
auxiliary enclosure.
Rev.02
c. General Wiring
General Wiring Preparations
• Locate terminals
• Typically wiring enters the lower part of drive
• Knock-outs are provided on many drives
• Larger drives have a removable conduit entry or
gland plate
Confidential / Property of Danfoss Drives A/S
28
North America
Motion Controls

Advertisement

loading