VLT Installation
Objectives
These objectives are listed as a goal for this training module. A review at the end of
this module tests the student concerning these objectives.
Rev.02
Objectives
Student is able to...
•
State the main danger and precaution to be taken
when working with a VLT.
•
Identify the Reference Material needed for an
installation and where that material may be found.
•
Locate and explain each of the 9 steps needed during
the pre-installation checks.
•
Identify the 4 installation checks for proper operation.
•
Identify the correct terminals and general instructions
concerning the wiring of the power input, motor
output, control, external 24Vdc, brake and load-
sharing.
Confidential / Property of Danfoss Drives A/S
3
North America
Motion Controls
Need help?
Do you have a question about the VLT and is the answer not in the manual?