VLT Installation
3) Pre-Installation Checks
3) Pre-Installation Checks
This next section covers the 9 steps necessary in the pre-installation check.
Rev.02
a.
Visual Inspection
b.
Proper Handling
c.
Remove IM and kits from box
d.
Check that VLT matches what was ordered
e.
Check Incoming Power, Drive and Motor that they are
the same voltage range.
f.
Insure that all hand tools, auxiliary equipment and kits
are available.
g.
Insure Drive can handle maximum current of motor
h.
Record Motor Data
i.
Check Motor Wiring
Confidential / Property of Danfoss Drives A/S
6
North America
Motion Controls
Need help?
Do you have a question about the VLT and is the answer not in the manual?