1.
Remove the protective covers (not shown) from the front panel LC fiber‐optic port
(port 22 in this example) and from the connectors on each end of the cable.
Note: Leave the protective covers in place when the connectors are not in use to prevent
contamination.
2.
Insert the LC cable connector into the
Note: To remove the LC cable connector, press on its release tab and pull it out of
Mini-GBIC
LC
Figure 3-19
Cable Connection to LC Fiber-Optic Connectors
Â
1 Mini-GBIC MT-RJ port connector
2 LC cable connector
3.
Plug the other end of the cable into the appropriate port on the other device. Some
cables may be terminated at the other end with two separate connectors, one for each
fiber‐optic strand. In this case, ensure that the transmit fiber‐optic strand is connected
to the receive port and the receive fiber‐optic strand to the transmit port.
4.
Verify that a link exists by checking that the port Link/Activity LED is on (blinking
green or solid green). If the Link/Activity LED is off, perform the following steps until
it is on:
a.
Verify that the device at the other end of the segment is ON and connected to the
segment.
Mini-GBIC
connector.
Ã
À
Á
Connecting to the Network
LC connector until it clicks into place.
3 Release tab
4 Link/Activity LED
SecureStack C2 Installation Guide 3-29
Need help?
Do you have a question about the SecureStack C2 C2G124-24 and is the answer not in the manual?
Questions and answers