Cable Management - Havis DS-DELL-400 Series Owner's Manual

Havis docking station for dell latitude rugged extreme notebooks
Table of Contents

Advertisement

Cable Management

1)
Orient the Docking Station in a position that is comfortable to work with.
2)
Install all cables that are necessary for computing needs.
Use Zip Ties (Hardware Kit Item 1) to strain relieve cables to the Strain
Relief Points, routing all cables together to the front of the Docking Station.
3)
Secure cable bundle to the Mounting Bracket with a supplied Zip Tie.
4)
Create a service loop with cable bundle to ensure that no tension is on the
connectors and to enable intended motion.
5)
Tie off cables onto a stationary part of the mounting system.
(Mounting system not included with Docking Station)
necessary to secure cables.
This loop must be large enough
to allow full range of expected
rotation and extension without
stressing connections.
Collect cables to secure
to the mounting system
(Note: mounting system not included)
Use as many zip ties as
www.havis.com • 1-800-524-9900
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents