Changing Wiring For 110 Volt Operation; Grounding - Jandy Pro Series Installation And Operation Manual

Hide thumbs Also See for Pro Series:
Table of Contents

Advertisement

Page 8
ENGLISH
3.3
Changing Wiring for 110 Volt
Operation
WARNING
Potentially high voltages in the Levolor control box
can create dangerous electrical hazards, possibly
causing death, serious injury or property damage.
Turn off the power at the main circuit breaker
providing power to the control box to disconnect
the control box from the system. To properly and
safely wire the system, be sure to carefully follow the
applicable requirements of the National Electrical
Code (NEC), NFPA 70 or the Canadian Electrical
Code (CEC), CSA C22.1. All applicable local
installation codes must also be adhered to.
Refer to Figures 3 and 4 and do the following:
1.
Cut the splice cap connecting the black/white and
the black/red wires. See Figure 3.
2.
Connect the black/red wire with the black wire and
connect to the line side of power. See Figure 4.
3.
Connect the black/white wire with the black/
yellow wire and connect to the neutral side of
power. See Figure 4.
Transformer
6
Line
Ground
Figure 4. Modified Wiring for 110 Volt Operation
Jandy Pro Series Levolor
Models K-2100
5
2
1
Neutral
II Electronic Water Leveler
®
3.4

Grounding

Connect the green ground wire marked
grounding terminal of your electrical service or supply
panel with a continuous copper conductor having green
insulation.
The copper conductor must be equivalent in size to the
circuit conductors supplying this equipment, but no
smaller than No. 12 AWG (3.3mm).
Refer to your local codes for the acceptable grounding
wire gauge.
|
Installation and Operation Manual
to the