Download Print this page

Packing Checklist & Assembly - Billy Goat CR551V Owner's Manual

Compact power rake

Advertisement

CR POWER RAKE Owner's Manual
PACKING CHECKLIST
NOTE: Items in ( ) can be referenced in the Parts Illustration and Parts List on pages 10-11.
Your Billy Goat Power Rake is shipped from the factory in one carton, completely assembled.
READ all safety instructions before assembling unit.
TAKE CAUTION when removing the unit from the box the Handle Assembly is attached and folded over.
PUT OIL IN ENGINE BEFORE STARTING
PARTS BAG & LITERATURE ASSY
Warranty card P/N- 400972, Owner's Manual P/N-350518, Declaration of Conformity P/N-100504, General Safety and
Warnings manual P/N-100295, and Literature CR Accessories 350246.
T
LV, .386" X 1.063" X .082" MZ
/8"-16 X 1" HCS ZP
NG WA
NG REEL
E MTG.
DE MTG.
EL PM
/4-20 X 3/4 HCS ZP
4-20
RDENED REEL OS900SP
7 x 1.750 x 0.119
CK 7/8 INT. TOOTH
14
ASSEMBLY
NOTE: Items in ( ) can be referenced in the Parts Illustration and Parts list on pages 10-11.
1. UNFOLD the upper handle (item 26) and slide handle lock loops (item 28) into place to secure the upper handle to the
lower.
2. CHECK engine oil level and fill to proper level with engine manufacturers recommended grade of oil. Move height adjust
lever to down position, to level engine during checking. See engine manufacturer's instruction manual.
3. CONNECT spark plug wire.
Part No 350518
4
Boxing Parts Checklist
Vanguard Engine
Manual
Literature Assy
P/N-350045
350518_-_HI

Advertisement

loading