Download Print this page

Packing Checklist & Assembly - Billy Goat AE403 Owner's Manual

Advertisement

AE403 Owner's Manual
PACKING CHECKLIST
Your Billy Goat is shipped from the factory in one carton, completely assembled.
READ all safety instructions before assembling unit.
TAKE CAUTION when removing the unit from the box.
PUT OIL IN ENGINE BEFORE STARTING
PARTS BAG & LITERATURE ASSY
Warranty card P/N- 400972, Owner's Manual P/N-360512, General Safety and Warnings Manual Renovation-
100295, Declaration of Conformity P/N-100500.
ASSEMBLY
NOTE: Items in ( ) can be referenced in the Parts Illustrations and Parts Lists on pages 10-13.
1. UNFOLD the upper handle (item 48) and slide handle lock loops (item 118) into place to secure the upper handle to the
lower handle (item 82 & 83).
2. ASSEMBLE the water tank to the unit and secure with the two carriage bolts, two locknuts and washers (items 137, 105
and 111) that can be found in the parts bag.
3. FILL the water tank (item 2) to desired weight with water ONLY.
4. CHECK engine oil level and fill to proper level. Also check oil in gear reduction reservoir and fill if necessary. See engine
owner's manual for type and amount of oil to use. Move the tine engagement lever to the down position, to level engine
during checking.
5. CONNECT spark plug wire. Set the engine stop switch to the ON position. You will use the stop switch on the handle
during operation.
FILL WITH WATER
ONLY!
5
Boxing Parts
Checklist
Owner's Manual
AE403 360512
Engine Manual Per
Model
Vanguard
360512_A_HI

Advertisement

loading

This manual is also suitable for:

Ae403v